According to the report of Mehr news agency, quoting from the Vice President for Science, Technology and Knowledge-based Economy, in line with the policies of the 13th government on developing capacities, creating synergies and realizing the knowledge-based economy, this agreement is aimed at promoting national resilience and international competitiveness and reducing foreign exchange and Dependence of the oil industry by benefiting from the capacity of the biosphere of technology and innovation, including knowledge-based and technological companies in the field of indigenization, design, implementation and integrated management of hydraulic fracturing and related technologies, between the vice president of science, technology and knowledge-based economy, represented by Reza Sultan Alizadeh as the assistant to the Presidents Science, Technology and Economics Vice President in the field of knowledge market development on the one hand, and Arundan Oil and Gas Company, represented by Abdullah Adhari Ahwazi as the CEO, was signed on the other hand.
The subject of the mentioned agreement is the localization of integrated design, implementation and management of hydraulic fracturing and related technologies, and its validity has been determined for four solar years.
Facilitating the financial provision of a part of the project from the appropriations of Table No. 9 of the Budget Law of 1403 in accordance with the rules in the Scientific Vice-Chancellor, shaping the ecosystem of technology and innovation regarding indigenization and technology acquisition (HF) by providing the conditions for the use of special customs facilities for companies Knowledge base in order to speed up and facilitate the import of some key items with the aim of reducing the risk of implementing project activities, identifying and introducing technological and knowledge based companies with scientific, technical and operational competence to implement project failure activities, forming and managing the acquisition and localization consortium Technology (HF), identification, introduction and use of elites, consultants and experienced people to advance project goals, support the process of identification, acceleration and development of technologists and development of knowledge-based breeding companies for localization and acquisition of technology (HF); Facilitating the issuance of legal licenses related to the vice-chancellor as described below for indigenization and technology acquisition (HF) and obtaining a license for the indigenization and technology acquisition (HF) project as a Peshran project in accordance with the rules in the scientific vice-chancellor, including the obligations of the scientific, technology and economic vice-chancellor Presidential presidency is knowledge-based.
Also, cooperation in the process of competent identification in order to form a consortium and propose them to the deputy, cooperation and consultation in the identification of the internal and external supply chain of the projects imported items, issuing the necessary permits for the implementation of the process of workshop and field tests in subsidiaries, including the obligations of the company in The aforementioned agreement was announced.
The joint obligations of this agreement include the preparation and regulation of the road map for design, construction, operation, provision of technical and engineering services, work schedule and test time (laboratory, workshop and field), maintaining confidentiality and non-disclosure of the technical knowledge obtained, supporting the identification and The use of competent and capable companies related to the project subject in the form of holding specialized meetings and technological events and cooperation and participation in holding specialized meetings in order to break down the project activities and prepare and regulate the work plan and time of deliverable items of the project.
It should be noted that hydraulic failure is a hydraulic phenomenon that occurs in oil and gas wells; In this way, fluids are injected under very high pressure into the rocks of the well deep in the ground, so that the rocks crack under high pressure, break and oil or gas is released. The fluids used for this purpose can be water, sand or chemicals. In fact, by hitting these materials under pressure through drilled wells on the surface of the rocks, they apply pressure to the rock until the pressure reaches the value of the fracture pressure, then they continue the injection until hydraulic failure occurs. When the failure occurs, the injected fluid is withdrawn from the well. To prevent clogging in the cracks, a substance called proppant is also injected into the rock along with the high pressure fluid. During fluid injection, the amount of material leakage must be controlled. If there is no control, the failure may not occur properly, the geometry of the failure may change and the yield may decrease.